Skip to content

Manufacturing and Construction

Fewer engineering hours on paperwork and more on the project

Quotes, bills of materials and technical reports that are prepared automatically, and ERP data that reaches decision-makers without being rebuilt by hand.

What we see in the sector

Problems that come up in every conversation

  • Slow technical proposals and quotesEngineers who spend hours building each quote from the client’s requirements.
  • Bills of materials and breakdowns in ExcelCalculations prepared by hand, with the risk of error and the time that involves.
  • Data trapped in legacy ERP systemsInformation that exists but that nobody can consult without exporting and cross-referencing spreadsheets.
  • Technical reports rebuilt the same way every timeDocuments with the same structure that are written from scratch for every project.

Results

Case studies in this sector

−65%

time spent on each technical proposal

Sodeca

Manufacturing · AI Implementation

Challenge
The technical team spent a disproportionate amount of time preparing each sales proposal by hand.
What we did
Technical proposals are generated from the client’s requirements, and the engineering team reviews them instead of writing them.
Result
Weekly hours freed up for higher-value support and product development.

+45%

more qualified leads

Heroturfs

Sports industry · AI Implementation

Challenge
Opportunities were being lost for lack of a fast response and an initial screening of each project.
What we did
Automatic project qualification from the corporate website, connected directly to the CRM.
Result
Three hours a week freed up for the sales team.

Thirty minutes to find out where to start

Tell us what you want to solve. You will leave the session with an initial assessment and, if there is a fit, an investment range.

  • 30 minutes by video call
  • An initial assessment of your case
  • Reply within one business day